Odeillo solar furnace
Odeillo solar furnace is a research facility in Fort-Romeu-Odeillo-Via in the south of France. At 54 m (177 ft) tall and 48 m (157 ft) wide, it is the world’s largest solar furnace.
The furnace was built between 1962 and 1968, and became operational in 1970, used to study materials at very high temperatures.
The furnace consists of a large concave mirror measuring nearly 2,000 sq. m, which reflects sunlight onto a small focal point that reaches temperatures of more than 3,000ºC (5,430ºF). Opposite the mirror are hundreds of flat mirrors angled so that they reflect the sun’s rays onto the mirror.
It is used for several purposes, including melting steel, generating electricity via a steam turbine, making hydrogen fuels, testing re-entry materials for space vehicles, and performing high-temperature metallurgic experiments.
[edit] Related articles on Designing Buildings
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.